eShelfseShelfs

Hot Line :+2347075301759,08038736720

Email Us : info@eshelfs.com

HOME ABOUT US THESIS / PROJECT TOPICS DOWNLOAD PAYMENT DETAILS DATA ANALYSIS PLAGIARISM TEST HIRE A WRITTER MENU ☰
ABOUT US THESIS / PROJECT TOPICS INSTANT DOWNLOAD PAYMENT DETAILS DATA ANALYSIS PLAGIARISM TEST HIRE US

Get Thesis Now !

PROJECT TOPIC:  THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA
Department:  Bio Chemistry
AMOUNT:  10,000
FORMAT:   MS WORD
PAGES:  78
 
Get Complete Work

Abstract Preview

ABSTRACT

 This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in the normal processes of procuring and prosecuting building and civil engineering construction work at both pre-contract and post contract stages of construction. The factors that usually call for these delay and disruption in construction projects of the numerous project on the construction landscape and on the parties that are involved in carrying out the projects.   This study continued with elucidating what the Quantity Surveyor and the other parties involved in the construction process can do to eliminate delays and disruption in construction in Nigeria.    According to this study, inadequate planning, incompetent project manager, variation in project scope, political factors, price fluctuation etc., contributes to the delays and disruption of building construction project and thereby affecting their cost also. Most of the proper majors are recommended for the elimination of delays and disruptions on construction project i.e Adequate pre-contract study, engaging competent construction professionals etc.

TABLE OF CONTENTS

CHAPTER ONE

INTRODUCTION

1.1    Background of study                                           

1.2    Statement of problem                                         

1.3    Purpose of study                                                

1.4    Research Questions                                                    

1.5    Significance of study                                           

1.6    Scope of Study                                                          

1.7    Definition of Terms                                                     

CHAPTER TWO

LITERATURE REVIEW

2.1    Delay and Disruption                                           

2.2    Construction Delay and Causes                             

2.2.1 Why Construction Projects are delayed and Abandoned                                                            

2.2.2 Common problems causing delay in construction  

2.2.3 Inadequate pre-contract study and Planning   

2.2.4 Award of Contract                                              

2.2.5 Variations                                                  

2.2.6 Fluctuations                                                       

2.2.7 Natural Disaster                                         

2.2.8 Poor Executive Capacity of the Contractor      

2.3    Cause of High Costs of Construction                       

2.4    Time Over-Runs and Cost                                    

2.5    Delay and Disruption in Construction in Summary

CHAPTER THREE

METHODOLOGY

3.1    Research Design                                                 

3.2    Area of Study                                                            

3.3    Population of Study                                                     

3.4    Sampling Technique                                            

3.5    Instrument for Data Collection                              

3.6    Validity of an Instrument                                     

3.7    Reliability of Instrument                                               

3.8    Method of Data Collection                                    

3.9    Method of Data Analysis                                              

CHAPTER FOUR

PRESENTATION AND ANALYSIS 0F DATA OR RESULT

4.1    Results                                                                      

CHAPTER FIVE

DISCUSSION AND CONCLUSION OF RESULTS

5.1    Discussion of Findings                                          

5.2    Conclusion of the Study                                               

5.3    Recommendation                                                       

5.4    Implication of the Findings                                   

5.5    Suggestion for Further Study                                

5.6    Limitation of Study                                                     

REFERENCES

APPENDIX

 


Download

CONTACT US

Contact address : eShelfs, East west Road, Choba. port harcourt River state

Email: info@eshelfs.com

Hot line :+2347075301759,08038736720,

click icon to Chat with Us

Disclaimer

eShelfs will only provide projects as a reference for your research. The projects ordered and produced should be used as a guide or framework for your own project. We are neither encouraging any form of plagiarism nor are we advocating the use of the projects produced herein for cheating.

Why Chose Us

Getting your project delivered on time is essential. You cannot afford to turn in your project past the deadline. That is why you must get your project online from a company that guarantees to meet your deadline.